Report: Charging differentials for 132kV generation
This report provides analysis to identify and quantify any differential in network charges paid by small (<100MW) generators connected to the 132kV transmission network in Scotland compared to those connected to the 132kV distribution network in England and Wales.
Download this document
731 KB, pdf